Article 76 of the Executive Regulations
Construction of new buildings
- In forcesince 1 January 2019
- Decision No. 12 of 2018Executive Regulations
Summary
Zero rating applies to construction Services for new buildings supplied by a Taxable Person and to Goods that the construction-Service provider Supplies during the work when used, installed or incorporated into the building or site as specified. It includes construction, site clearance, a new extension and supervisory engineering or surveying, but excludes demolition, architects' and interior-design fees, restoration, removable Goods and post-completion Supplies.
Official text
A.The zero rate shall apply to the Supply of construction Services in relation to new buildings carried out by the Taxable Person. Goods Supplied by a Person making a Supply of construction Services, in the course of providing construction Services for a new building, shall also be zero rated.
B.For the purposes of applying this Article, a “building” shall mean residential, commercial or industrial buildings, such as a dwelling, offices, factories, workshops, retail stores, multi-storey car parks, power stations, oil refineries, liquefied natural gas stations or oil fields.
C.Construction Services in relation to new buildings shall include the following:
1.Construction works,
2.Site clearance Services,
3.A new extension to an existing building.
4.Services provided by engineers and surveyors and similar Services of a supervisory nature.
D.Construction of buildings shall not include the following activities:
1.Demolition of existing buildings on the land on which the new building is to be constructed.
2.Architects’ and interior design fees.
3.Restoration works.
E.Goods supplied by a Taxable Person as part of the provision of construction Services in relation to a new building shall include those used, installed or incorporated into the building or its location, and shall include:
1.Building materials.
2.Materials necessary to construct specialised raised flooring for computer server rooms.
3.Fixtures and equipment to the extent that such fixtures and equipment are permanently affixed to the building and can not be removed without causing damage to the building or the plant and equipment.
4.Goods supplied to conduct civil engineering works necessary for the development of the building including:
a)Sewerage systems.
b)Piping.
c)Roads and paths necessary for the proper use and enjoyment of the building.
d)Car parking for use by the occupants of the building and visitors.
5.Goods supplied to connect the building to a water supply and Telecommunications Services.
6.Photovoltaic cells and related equipment designed to produce electricity and hot water for the building.
F.The Supply of Goods provided in the course of construction Services in relation to a new building shall not include the Supply of fixtures and equipment not permanently affixed to the building and which can be removed without damage to the building or fixtures and equipment, including:
1.Furniture that is not affixed to the building.
2.Goods supplied for landscaping purposes.
3.Swimming pools.
4.Decorative lighting.
5.Paintings, murals and other artwork.
6.Carpets.
7.Moveable partitions.
G.A Taxable Person who makes Taxable Supplies subject to the zero rate, and other activities subject to a different Tax treatment in the course of executing a particular contract, shall apportion the contract price to determine the price of each of the parts of the contract subject to
a different Tax treatment, provided that each part does not fall below the fair Market Value for the Goods or Services supplied.
H.The zero rate shall not apply to Goods or Services supplied after the building has been completed.
Explanation
One contract can contain zero-rated and differently treated components. Consider timing, permanence and Service type, and apportion mixed consideration at no less than fair Market Value for each part.
Relevant to: Contractors, developers, engineers, Suppliers, project accountants and property owners.
Split the construction project
Confirm a new building or new extension rather than restoration.
Construction Services include construction works, site clearance and a new extension to an existing building, but not restoration works (Article 76(C) and (D) of the Regulations).
Identify the construction-Service provider and the Goods supplied during the work.
Zero rating extends to Goods supplied by the Taxable Person in the course of construction Services for a new building where used, installed or incorporated into the building or its site (Article 76(A) and (E) of the Regulations).
Classify the included work.
Included work covers construction, site clearance, a new extension, and Services of engineers, surveyors and similar supervisory Services (Article 76(C) of the Regulations).
Separate demolition, architect, interior-design and restoration work.
Construction Services exclude demolition of existing buildings on the land, architects' and interior-design fees, and restoration works (Article 76(D) of the Regulations).
Test permanent attachment and damage on removal.
Fixtures and equipment are included only to the extent they are permanently affixed and cannot be removed without damaging the building or themselves (Article 76(E)(3) of the Regulations).
Separate removable Goods.
Unaffixed furniture, landscaping Goods, swimming pools, decorative lighting, paintings, murals and other artwork, carpets and movable partitions are excluded (Article 76(F) of the Regulations).
Apportion a mixed price at no less than fair Market Value.
A Taxable Person combining zero-rated and differently treated work in one contract must apportion the price, with each part at no less than the fair Market Value of the Goods or Services supplied (Article 76(G) of the Regulations).
Separate Supplies made after completion.
The zero rate does not apply to Goods or Services supplied after the building has been completed (Article 76(H) of the Regulations).
Worked example
One BHD 110,000 contract
A contractor builds a new office and Supplies movable furniture: BHD 100,000 for construction and incorporated materials and BHD 10,000 for furniture. Zero rating is not applied to all BHD 110,000; furniture is removable and each component must not be priced below fair Market Value.
Key checks
No. Restoration works are expressly excluded from construction Services (Article 76(D)(3) of the Regulations).
No. Architects' and interior-design fees are excluded, whereas Services of engineers and surveyors of a supervisory nature are included (Article 76(C)(4) and (D)(2) of the Regulations).
Yes. A new extension to an existing building is an included construction Service (Article 76(C)(3) of the Regulations).
No. The zero rate does not apply to Goods or Services supplied after the building has been completed (Article 76(H) of the Regulations).
The price is apportioned by VAT treatment, with no part below the fair Market Value of the Goods or Services supplied (Article 76(G) of the Regulations).
Yes. Under the VAT Real Estate Guide, version 1.7, section 3.6.1, the supplier obtains a certificate prepared by the main contractor or the property owner confirming that the building is new for the purposes of this Article and containing the details the guide lists, such as the land address, the owner's name and a description of the building. Without it the standard rate applies to all supplies even if the building is new (section 3.6.3); only the services needed to obtain the building permit are exempt from the requirement (section 3.6.2).
Yes. A new extension to an existing building is a construction service (Article 76(c)(3) of the Regulations), and under the VAT Real Estate Guide, version 1.7, section 3.3, an extension is a new building where it adds a room or functional space, such as one or more floors, whenever it is built; costs relating to the existing building are apportioned under section 3.7.3. Paragraph (j) concerns supplies made after completion of the construction itself.
Under the VAT Real Estate Guide, version 1.7, section 3.6.3, a main contractor supplying the owner directly obtains the certificate from the owner; if the owner does not provide one, the main contractor may prepare the certificate itself, and it zero-rates its Supply to the owner only with the owner's certificate or one it prepared, possibly attaching the building permit obtained from the owner. A subcontractor without a certificate from the main contractor or owner applies the 10% standard rate.